REQUEST A TOUR If you would like to see this home without being there in person, select the "Virtual Tour" option and your agent will contact you to discuss available opportunities.
In-PersonVirtual Tour
$ 299,000
Est. payment /mo
Active
9700 W Deep Creek Blvd Hastings, FL 32145
4 Beds
2 Baths
1,716 SqFt
UPDATED:
Key Details
Property Type Mobile Home
Sub Type Mobile Home
Listing Status Active
Purchase Type For Sale
Square Footage 1,716 sqft
Price per Sqft $174
Subdivision Flagler Estates
MLS Listing ID 252174
Style Mobile Home
Bedrooms 4
Full Baths 2
HOA Y/N No
Total Fin. Sqft 1716
Year Built 2003
Annual Tax Amount $910
Tax Year 2024
Lot Size 0.800 Acres
Acres 0.8
Property Sub-Type Mobile Home
Property Description
Nestled in the rural community of Flagler Estates, this charming home offers a tranquil creek-front retreat along Six Mile Creek. At nearly an acre, this wooded lot, adorned with mature trees, provides both privacy and a picturesque natural setting. The property features a 2003 home encompassing a total of 1,956 square feet, with 1,716 square feet of conditioned living space. Inside, the home's open floor plan is bright and inviting, showcasing neutral tones and a spacious kitchen. It comprises four bedrooms and two bathrooms, accommodating both comfort and functionality. The master suite has an expansive ensuite bathroom and oversized closet. Embracing the Florida lifestyle, the residence includes a spacious covered and screened lanai, perfect for outdoor relaxation. Additional storage is available with a 24' x 12' shed. Original owners have maintained the property with practical updates including a roof replacement in 2019, a new heat pump installed in 2020, and new ductwork. competed in 2017. The water heater was replaced two and a half years ago. The property is equipped with a gravity fed septic tank, last pumped in 2023, and a private well with aerator and water softener. The adjacent easement is owned by the Water Management District and will not be developed for residential purposes, adding to the privacy. The Open Rural (OR) zoning and absence of a homeowners association offer flexibility for various uses of the property including animals and recreational activities.
Location
State FL
County St. Johns
Area 13
Zoning OR
Direction W
Rooms
Primary Bedroom Level 1
Master Bedroom 1
Building
Story 1
Architectural Style Mobile Home
Level or Stories 1
New Construction No
Schools
Elementary Schools South Woods
Middle Schools Gamble Rogers
High Schools Pedro Menendez
Others
Senior Community No
Virtual Tour https://www.youtube.com/watch?v=ZlIXUAXwgPg
Listed by Great Expectations Realty
GET MORE INFORMATION
QUICK SEARCH